LAT — Law Admission Test

Air, Rail & Road Networks — Practice Test 1

Take the Air, Rail & Road Networks — Practice Test 1: 29 multiple-choice questions (39 minutes) with instant scoring and a full answer review. Covers 29 Pakistan Studies. Air, Rail & Road Networks of Pakistan from Dogar's Testmaster LAT guide (Pakistan Studies) — every question with the book's bold answers.

What this test covers

All 29 questions in this test

Preview every question and its options below. Log in or sign up (free) to take the timed test, get your score, and unlock the correct answers with explanations.

  1. Q1. The length of the Karakoram Highway of Pakistan is:

    • A. 755 km
    • B. 706 km
    • C. 749 km
    • D. 806 km
  2. Q2. The route length of the Railway line in Pakistan is ______.

    • A. 7696 km
    • B. 7999 km
    • C. 11881 km
    • D. 7875 km
  3. Q3. The second name of the Karakoram Highway is:

    • A. Kaghan Road
    • B. Silk Route
    • C. China Road
    • D. None of them
  4. Q4. How long is the Islamabad-Peshawar Motorway?

    • A. 102 Km
    • B. 155 Km
    • C. 142 Km
    • D. 160 Km
  5. Q5. Which of the following is the code name of the Karachi-Lahore-Peshawar Highway?

    • A. N6
    • B. N7
    • C. N9
    • D. N5
  6. Q6. Karachi to Quetta Road is called ______.

    • A. N25
    • B. N26
    • C. N27
    • D. N28
  7. Q7. The code name of the Karakoram Highway is ______.

    • A. N30
    • B. N31
    • C. N35
    • D. N36
  8. Q8. The most preferred mode of transportation in Pakistan is ______.

    • A. Road transportation
    • B. Sea transportation
    • C. Road & air transportation
    • D. Air transportation
  9. Q9. What is the total length of N5?

    • A. 1856 km
    • B. 1716 km
    • C. 1819 km
    • D. 1956 km
  10. Q10. The total length of the Karachi-Khuzdar-Quetta-Chaman road is ______.

    • A. 716 km
    • B. 916 km
    • C. 813 km
    • D. 516 km
  11. Q11. N-35 starts from Hasan Abdal through Gilgit to:

    • A. Khunjerab
    • B. Chitral
    • C. Malakand
    • D. Sakardu
  12. Q12. The length of N-35 is ______.

    • A. 903 km
    • B. 806 km
    • C. 953 km
    • D. 973 km
  13. Q13. The code name of the Islamabad-Lahore Motorway is:

    • A. M4
    • B. M2
    • C. M6
    • D. M3
  14. Q14. The length of the Islamabad-Lahore Motorway is:

    • A. 367 km
    • B. 335 km
    • C. 355 km
    • D. 345 km
  15. Q15. M1 motorway is ______.

    • A. Lahore-Islamabad
    • B. Islamabad-Peshawar
    • C. Islamabad-Lahore
    • D. Lahore-Peshawar
  16. Q16. The name of the Faisalabad-Pindi Bhattian Motorway is ______.

    • A. M4
    • B. M2
    • C. M3
    • D. M5
  17. Q17. The Locomotive of Pakistan Railways is located in:

    • A. Lahore
    • B. Peshawar
    • C. Karachi
    • D. Sukkar
  18. Q18. The total length of the Islamabad-Peshawar Motorway is ______.

    • A. 155 km
    • B. 124 km
    • C. 144 km
    • D. 134 km
  19. Q19. The N-55 is also called ______.

    • A. Indus Highway
    • B. Silk Road
    • C. Quetta Peshawar Road
    • D. Peshawar Karachi Road
  20. Q20. The total length of the Indus Highway is?

    • A. 1264 km
    • B. 2165 km
    • C. 1065 km
    • D. 1165 km
  21. Q21. NHA stands for:

    • A. National Highway Authority
    • B. National House Authority
    • C. National High profile Authority
    • D. None of them
  22. Q22. The headquarters of Pakistan Railways is located in:

    • A. Rawalpindi
    • B. Islamabad
    • C. Peshawar
    • D. Lahore
  23. Q23. Which authority is responsible for the promotion and regulation of civil aviation activities and development of the infrastructure of air service in Pakistan?

    • A. Civil Aviation Authority
    • B. PIA
    • C. Airport Authority
    • D. None of them
  24. Q24. Which one of the followings is the National Flag Carrier Shipping Corporation?

    • A. Pakistan Naval Shipping Corporation
    • B. Pakistan National Shipping Corporation
    • C. Both A & B
    • D. Neither A nor B
  25. Q25. Which is the third Seaport of Pakistan?

    • A. Gawadar
    • B. Ormare
    • C. Karachi
    • D. Jiwani
  26. Q26. The Makran Coastal Highway is called ______.

    • A. N-12
    • B. N-8
    • C. N-10
    • D. N-6
  27. Q27. The Kaghan Valley road is called ______.

    • A. N-9
    • B. N-13
    • C. N-11
    • D. N-15
  28. Q28. The Nowshehra-Dir Chitral Highway is called ______.

    • A. N-55
    • B. N-45
    • C. N-65
    • D. N-75
  29. Q29. Which of the followings is the length of the Kaghan Valley road?

    • A. 155 km
    • B. 175 km
    • C. 185 km
    • D. 195 km

Loading the test…